Additions to South Macon Elementary School

by May 16, 2018

ADVERTISEMENT FOR BIDS

American South General Contractors is accepting subcontractor bids for the Additions to South Macon Elementary School project. The proposal for this project has to be turned in to the owner on June 5th, 2018 at 2:00 P.M. However, subcontractor bids are requested to be emailed to us by 2:00 P.M. on June 4th in order to allow ASGC time to process the subcontractor quotes. Minority and HUB businesses are strongly encouraged to bid this project. This project has an 8800 s.f. addition and extensive renovation of the existing school building. The construction scope of work consists of selective site demolition, selective building demolition, earthwork, exterior improvements, utilities, landscaping, concrete, CMU, masonry, structural steel, rough carpentry, interior architectural woodwork, standing seam metal roof, water proofing, fireproofing, HM doors and frames, flush wood doors, overhead coiling fire doors, aluminum framed entrances and storefronts, non-structural metal framing and drywall, terrazzo flooring, ACT,  resilient flooring and base, tile carpeting, painting, signage, specialties, horizontal louver blinds, residential appliances, plumbing,  HVAC, Electrical, safety and security. For additional information please contact Jay Jenkins (919)721-6345 or jjenkins@americansouthgc.com .

Print Friendly, PDF & Email