Camp Butner Range Control Building

by July 28, 2020

ADVERTISEMENT FOR BIDS

Sealed proposals will be received until 3:00 pm
on August 25, 2020, in the Cafeteria at
Joint Force Headquarters,
North Carolina National Guard:
1636 Gold Star Drive,
Raleigh, NC 27607
for the construction of the
Camp Butner Range Control Building
at which time and place bids will be opened and read.

An Open Pre-Bid Meeting will be held at 10:00 am on
August 13, 2020 at the Project Site at
Camp Butner,
539 Robert’s Chapel Rd.,
Stem, NC 27581.

The meeting will identify preferred brand alternates and their
performance standards that the owner will consider for approval on this project.

Complete plans and specifications for this project can be obtained from
Smith Sinnett Architecture,
4600 Lake Boone Trail,
Suite 205,
Raleigh, NC 27607
(919) 781-8582
during normal office hours after August 3, 2020.

Plan Deposit of $150.00 is required for hard copies.

State of North Carolina and the North Carolina National Guard
reserves the unqualified right to reject any and all proposals.

No Bid may be withdrawn after the scheduled closing
time for the receipt of bids for a period of 60 days.

Signed:
North Carolina National Guard

Print Friendly, PDF & Email