Central Piedmont Community College Merancas Phase IV Classroom Building – Early Site and Structure Package Pre-Bid Meeting and Bid Opening

by October 18, 2018

CENTRAL PIEDMONT COMMUNITY COLLEGE
MERANCAS PHASE IV CLASSROOM BUILDING –
EARLY SITE AND STRUCTURE PACKAGE
PRE-BID MEETING AND BID OPENING

Rodgers will accept sealed bid proposals from project specific prequalified trade contractors for bid packages 02B Below Grade Electrical, 02E Below Grade Plumbing, 03A Complete Concrete Sub and Superstructures, 05A Structural and Miscellaneous Steel, 31A Complete Sitework until 2:00 P.M. on Thursday, November 15th, 2018 in Room 218 of the Central Piedmont Community College (CPCC) Drumm Facilities Services Building, 1325 East 7th Street, Charlotte, NC 28204 for the construction of the Merancas Phase IV Classroom Building at which time and place bids will be opened and read.

An open Pre-Bid Meeting will be held for all interested bidders on Tuesday, October 23rd, 2018 at 2:00 P.M. in Room 218 of the CPCC Drumm Facilities Services Building, 1325 East 7th Street, Charlotte, NC 28204.  The meeting will address project specific questions, issues, bidding procedures and bid forms.

The meeting is also to identify preferred brand alternates and their performance standards that the owner will consider for approval on this project.  In accordance with General Statute GS 133-3, Specifications may list one or more preferred brands as an alternate to the base bid in limited circumstances.  Specifications containing a preferred brand alternate under this section must identify the performance standards that support the preference.  Performance standards for the preference must be approved in advance by the owner in an open meeting.  Any alternate approved by the owner shall be approved only where (i) the preferred alternate will provide cost savings, maintain or improve the functioning of any process or system affected by the preferred item or items, or both, and (ii) a justification identifying these criteria is made available in writing to the public.  In accordance with GS133-3 and SCO procedures the following preferred brand items are being considered as Alternates by the owner for this project.

  • Floor Boxes to be Evolution Floor Boxes by Wiremold

The project is located on the CPCC Merancas Campus in Huntersville, NC. The building is a new approximately 65,000 square foot, 3 story building including, but not limited to, spaces for classrooms, laboratories, library, student life and services and conference / meeting. Scheduled construction commencement is January 2019.

Historically Underutilized Businesses are strongly encouraged to participate.

All communications for project specific information must go through Thomas Dunning at tdunning@rodgersbuilders.com.