East Wake Middle School project in Raleigh, NC

by November 29, 2017

NOTICE TO CONTRACTORS:

BIDDER PRE-QUALIFICATION REQUEST:

Barnhill Contracting Company, in association with DA Everett Construction Company has been selected as the Construction Manager @ Risk by Wake County Public Schools and is seeking to pre-qualify construction trade and specialty contractors to submit bids for furnishing labor, materials, equipment and tools for the East Wake Middle School project in Raleigh, NC.  PROJECT DESCRIPTION:  This project consists of the new construction of the East Wake Middle School for Wake County Public Schools constructed on an existing site of approximately 52 acres, located at 2700 Old Milburnie Rd, Raleigh, NC 27604.  On-site and off-site construction shall consist of grading, storm drainage, utilities, site improvements, paving, landscaping, and fencing.  The new building is a 227,000 sf, 3-level middle school with shallow CIP concrete foundations, structural steel and load-bearing masonry structure. The building envelope primarily consists of brick veneer on CMU masonry backup with 2-1/2” insulation, or brick veneer on metal stud backup with 3” insulation and Mod bit roofing over lightweight insulation concrete system.  Typical building interiors include CMU partitions, GWB partitions and assemblies, acoustical ceilings, PLAM casework, painting, flooring, and building specialties. Principal trade and specialty contractors are solicited for the following Bid Packages: BP100-General Trades; BP105-Final Cleaning; BP205 Demolition; BP221-Surveying; BP390-Turnkey Concrete; BP400-Turnkey Masonry; BP500-Turnkey Steel; BP550-Misc. Steel; BP725 Fireproofing, BP740-Roofing; BP750 Metal Wall Panels, BP790-Caulking & Waterproofing; BP800-Doors/Frames/Hardware; BP840-Glass & Glazing; BP925-Drywall; BP930-Ceramic Tile; BP960-Resilient Flooring/Carpet/ Base; BP963-Terrazzo Flooring; BP965-Wood Flooring; BP980-Acoustical Ceilings; BP990-Painting; BP1005-Toilet Specialties & Accessories; BP1010-Identifiying Devices; BP1015-Markerboards; BP1050-Lockers; BP1065-Operable Partitions; BP1110-Theater and Stage Equipment; BP1114-Loading Dock Equipment; BP1120 Library Furnishings; BP1140-Food Service Equipment; BP1148-Athletic Equipment; BP1220-Window Treatments; BP1230-Manufactured Casework; BP1232-Lab Casework; BP1235-Auditorium Seating; BP1240-Telescoping Bleachers; BP1420-Elevators; BP2100-Fire Protection; BP2200-Plumbing; BP2300-HVAC; BP2305-Testing & Balancing; BP2309-HVAC Controls; BP2600-Electrical; BP3100-Earthwork; BP3200-Asphalt Paving; BP3213-Concrete Paving & Sidewalks; BP3231-Fences & Gates; BP3290-Landscaping & Irrigation; BP3300-Site Utilities, BP3400 Turnkey Site. Additional Packages may be added and/or deleted at the discretion of the Construction Manager. Historically underutilized business participation is encouraged.  Interested contractors should submit their completed prequalification submittals, by February 23, 2018, to [email protected] or hardcopies can be mailed to Barnhill Contracting Company PO Box 31765 Raleigh, NC 27622 (4325 Pleasant Valley Road, NC 27612). PREQUALIFICATION FORMS CAN BE OBTAINED from our online plan room, www.barnhillplanroom.com, by clicking on the East Wake Middle School project under the Public Jobs tab or by contacting Debrielle Boone at [email protected] or call 919-781-7210.  Target bid date: May 2018.

 

Print Friendly, PDF & Email