ECU Clark-LeClair Infiltration System project in Greenville, NC

ECU Clark-LeClair Infiltration System project in Greenville, NC

by April 4, 2019

ADVERTISEMENT FOR BIDS

Frank L. Blum Construction will accept proposals until 3:00 pm on Monday, April 15, 2019 for the ECU Clark-LeClair Infiltration System project in Greenville, NC.

This project includes the Plaza Deck replacement on the south end (third base side) of the Clark-LeClair stadium concourse, remove plaza deck system, insulation and waterproof membrane to concrete substrate and replace with new waterproof membrane, insulation, and poured-in-place concrete fill and wearing surface.

Base Bid:  Remove and reinstall brick masonry at wall adjacent to plaza deck as necessary to replace concealed flashing and terminate new waterproof membrane as indicated on Drawing A1-Plaza Deck Replacement and as specified in Section 075556 “Fluid-Applied Protected Membrane Roofing” and Section 040120.63 “Brick Masonry Repair”.

Alternate:  In addition to work under base bid, provide penetrating water repellant on entire masonry wall area as indicated at Detail 9/A1 and as specified in Section 071900 “Water Repellants”.

Work will commence in mid-June 2019 and be completed by September 15, 2019.

MWBE forms are required for this project. There is a goal of 10% MWBE participation for this project.