ADVERTISEMENT FOR BIDS

State Utility Contractors, Inc. solicits subcontract proposals for the following work:  Soil Testing, Clearing and Grubbing, Curb and Gutter, Sidewalk and Driveway, Paving and Resurfacing, Hauling, Locate Utilities, Pavement Marking, Line Stops, Erosion Control, Landscaping, Traffic Control, Portable Toilets, Rock Excavation, Dry Bore and Jack, Manhole and Cover, 48-inch Tunnel, Bypass Pumping, CCTV Inspection, Project Signs, Stone Aggregate, Seeding Material, Concrete Pipe, Pipe, Valve and Fittings, and Corrugated Pipe for the FY20 Water/Sewer Infrastructure Construction – Contract 1 Project in Charlotte, NC.  The bid date for this project is May 7, 2020.  Minority businesses are encouraged to submit proposals for this work.  If additional information is needed, please contact Justin Collins at (704) 289-6400.  EOE M/F