Jones Ferry Road Water Treatment Plant Electrical Distribution Improvements

by August 12, 2019

ADVERTISEMENT FOR
REQUEST FOR QUALIFICATIONS

ORANGE WATER AND SEWER AUTHORITY
JONES FERRY ROAD WTP ELECTRICAL
DISTRIBUTION IMPROVEMENTS
CIP PROJECT NO. 272-52
ISSUE DATE:  AUGUST 15, 2019

Orange Water & Sewer Authority (OWASA) is inviting firms to submit a written statement of qualifications to provide engineering services for the Jones Ferry Road Water Treatment Plant project.  OWASA intends to select an engineering consultant based on the qualifications packages received in response to the Request for Qualifications (RFQ).

The entire RFQ is located on the OWASA web site (www.owasa.org) and may be downloaded at https://www.owasa.org/bid-opportunities

The primary objectives of the project are to provide:

a)   Upgrade the electrical system (gear and equipment) by eliminating the existing 2300VAC system and shifting the entire WTP to 480VAC system.
b)   Provide closed transition automatic transfer for both plant generators.
c)   Create redundant loop for main service feed and both plant generators.
d)  Complete studies as follows:
i)    Main Electrical Service Feed Study with Electrical Service Provider
ii)   Electrical Coordination Study
iii)  Arc Flash Study

Responses to the RFQ must be received by 2:00 p.m. on September 12, 2019. 

Print Friendly, PDF & Email