Liquid Bulk Pier Relocation / Turning Basin Widening- Port of Wilmington

by 11/30/2015

NOTICE TO CONTRACTORS, SUBCONTRACTORS AND MATERIAL SUPPLIERS
December 3, 2015

PROJECT:  Liquid Bulk Pier Relocation /
Turning Basin Widening- Port of Wilmington

The North Carolina State Ports Authority (NCSPA) desires to better understand the availability and interest of contractors, subcontractors, and material suppliers for the subject project.  This is a project of vital strategic importance for the NCSPA, and the schedules for design, bidding, and construction are compressed.  Therefore, this notice serves as the initial public announcement, and there may be further notices and information shared prior to the bid period.  Since the bid period will be short, the intent of the NCSPA is to inform bidders ahead of time to the best degree possible, such that bids can be produced quickly once the final construction documents are available.

SCOPE OF WORK
Per the following pages, the main elements of work are:

  1. New pipe bridge over shallow water from liquid bulk pier to Berth 1.
  2. Pipe rack supports structures at Berth 1, including liquid bulk loading platform.
  3. Installation of product pipelines and associated utilities, liquid bulk to pier to Berth
  4. Demolition of existing structures at the liquid bulk pier- platform, pier sections, breasting cells, and mooring dolphins.
  5. Dredging in the area of the demolished pier.

PROJECTED SCHEDULE (dates subject to change)

Availability of 100% construction documents, start of bid period    January 4, 2016
Bid Opening                                                                                             January 15, 2016
Notice to Proceed (assuming permits received)                                 January 22, 2016
Required Completion Date                                                                     May 15, 2016

Prime contractors submitting bids shall be prequalified by the NCDOT for dock/pier construction (work code 009200).  The NCSPA would appreciate responses from the prime contractors, and other firms (subcontractors and suppliers) who may have an interest.  At this time, the NCSPA is only looking for an expression of interest.  Whether a prime contractor responds to this notice, or not, has no bearing on the ability to bid the work.  This is not a shortlisting process.  Any prequalified contractor may submit a bid.

 

Please send responses to the Designer.  If there are questions or request for clarifications based on the information provided herein, these will be collected by the Designer, and questions and answers will be provided to all contractors and suppliers, similar to the usual process during a bid period.  Questions may be addressed to:

Designer:
Dennis K. Hoyle, P.E.
AECOM Technical Services of NC, Inc.
701 Corporate Center Drive, Suite 475
Raleigh, NC  27607
Phone No. 919-854-7748
[email protected]

Owner:
Mark A. Blake, P.E.
Director of Engineering and Maintenance
NC State Ports Authority
Wilmington, NC
Phone No. (910) 251-5674
[email protected]

 