Myrtle Grove Middle School Renovation Project in Wilmington, NC

by November 29, 2017

NOTICE TO CONTRACTORS:

BIDDER PRE-QUALIFICATION REQUEST:

Monteith Construction Corp has been selected as the Construction Manager @ Risk by The New Hanover County School Board and is seeking to prequalify construction trade and specialty contractors to submit bids for furnishing labor, materials, equipment and tools for the Myrtle Grove Middle School Renovation Project in Wilmington, NC.

An informational meeting will be held for all M/WBE certified contractors and vendors is being held on December 13th from 3:30 – 6:00 at the Office of New Hanover County Schools – 3702 Princess Place Drive, Wilmington NC 28405.

PROJECT DESCRIPTION:
The Myrtle Grove Middle School Renovation Project will include interior and exterior renovations to provide a modern, safe, and quality facility for the education of Wilmington’s youths. The existing facility to be updated is a one-story, 90,167 square foot school separated into six different wings connected by larger central area. Renovations will include reroofing, siding replacement, floor replacement, ceiling replacement, restroom updates, upgrades to MEP systems, and a small amount of new construction. This project will be conducted in multiple phases to allow the school to remain in operation during construction. The school is made up of 45 classrooms of various size, 17 storage rooms, 21 offices, 12 bathrooms w/ 2 additional bathrooms to be constructed, one gymnasium, 2 locker rooms, one library/media center, nurse’s office, reception area, 2 admin work rooms, 2 conference rooms, teachers’ lounge, 8 mechanical rooms, 7 electrical rooms, and one lobby. During each phase, students from the wing under renovation will be relocated to temporary mobile classrooms which will require concrete foundations and utility connections.

Principal trade and specialty contractors are solicited for the following Bid Packages:
02-Demolitian; 03-Concrete, Foundation & Flatwork for Mobile Classrooms; 04-Masonry; 05-Misc Metals; 06-Carpentry/Millwork; 07-Roofing & Insulation; 07C-Caulking; 08-Door & Hardware; 08A-Glass & Glazing; 09-Drywall, Framing & Siding; 09A-Ceilings; 09B Tile; 09C-Flooring; 09D-Painting & Wall Covering; 10-Accessories; 10A-Signage; 12-Window Coverings; 21-Fire Protection; 22-Plumbing; 23-HVAC; 26-Building Electrical; 32-Landscaping; 32A-Fencing; 33-Water & Utility Hookups for Mobile Classrooms.

Additional Packaged may be added and/or deleted at the discretion of the Construction Manager. Historically underutilized business participation is encouraged. Interested contractors should submit their complete prequalification submittals, by January 1st, 2018 at 4:00pm, to Attn: James Griffith at Jgriffith@monteithco.com or mail a hardcopy to Monteith Construction, Attn: Myrtle Grove Middle School Prequalification, 32 N. Front St, Wilmington, NC 28401.

PREQUALIFICATION ADVERTISMENT & FORMS CAN BE OBTAINED by accessing the following link: MrytleGroveRenovations or by contacting James Griffith at JGriffith@monteithco.com or call 910.791.8101. Please note: Plans will not be issued to any contractor until prequalification form is submitted and approved by Monteith Construction.

Print Friendly, PDF & Email