NCDOT C204368 Rockingham County I73/I-74 I-73/74 from US-74 Bypass West Of Rockingham at SR-1109 (Zion Church Rd) to North of SR-1304 (Harrington Rd). T.I.P. NC. R-3421A, R-3421B Miles 7.197 WBS 34542.3.6, 34542.3.7

by October 1, 2019

REQUEST FOR QUOTE FOR CONSTRUCTION OF

NCDOT C204368 RICHMOND COUNTY I73/I-74
I-73/74 FROM US-74 BYPASS WEST OF ROCKINGHAM AT SR-1109 (ZION CHURCH RD) TO NORTH OF SR-1304 (HARRINGTON RD).
T.I.P. NO. R-3421A, R-3421B MILES 7.197 WBS 34542.3.6, 34542.3.7

RESPOND WITH YOUR INTENT TO QUOTE

Contacts / Respond to:

Thalle Construction Company. By October 11, 2019 @ 1:00 pm C/O: Adrienne Duncan; quotes@thalle.com; (P) 919.245-1490  (F) 919-241-1659.

Project Description:
Work involves 10.897 miles of roadway and structures work including Grading, Drainage, Paving, Guardrail, Fencing, Signing, Pavement Marking, Utility construction, Erosion Control, Seeding and Reforestation. Letting date is October 15, 2019.  DBE (combined MBE/WBE) Goal is 10%.

Bid Documents: 
Are available from Thalle Construction online plan room https://secure.smartinsight.co/#/PublicBidProject/468341 can also be obtained/viewed by appointment at NCDOT Division offices, NCDOT central letting webpage, Construction Resource Center(s) of NC, and at Thalle’s office in Hillsborough NC.

Divisions of Work:
Survey, field-office, Clearing & grubbing, demo, earthwork, Import fill & gravel, Trucking, earthwork products, Fabric, Erosion-control, Seeding, Reforestation, Drainage, Utilities: Water -PVC DIP, bore & jack, stormwater RCP, CMP, HDPE-pipe, road-drainage, Precast; End-walls, drainage structures, frame covers & grates, asphalt paving, milling, rumble-strips, Striping & marking, curb and gutter, concrete flatwork, guardrail, Fences, Traffic control devices, MOT-flagging, Signs, Signals-ITS, Box- Culvert, Bridge-construction; deck-grooving, rebar, pile-driving, H-piles Structural steel, girder-erection, bridge-rail, decking, Bridge Joints and metal fabrication, barrier-rail, bearings, joint seals, Ready-mix concrete.

Business Utilization:
MBE/WBE/DBE firms are encouraged to participate & will be listed at time of bid.  Work & materials may be combined or divided to facilitate maximum participation. Subcontractors are obliged to sublet to 2nd & 3rd tier DBE subcontractors. DBE firms needing assistance with obtaining bonding, loan capital, lines of credit, insurance, QuickPay & payment-agreements, obtaining equipment & supplies materials or negotiate joint venture & partnership arrangements can contact Thalle for assistance. Thalle will negotiate fairly with interested DBE firms & will not reject firms as unqualified without sound reasons-based capabilities.

Print Friendly, PDF & Email