NCDOT C204533 Forsyth County: Future I-74 (US 421/I-40 BUS/NC 150) Project in Vicinity of: – Kernersville, NC 27284

by April 7, 2020

ADVERTISEMENT FOR BIDS 

REQUEST FOR CONSTRUCTION TRADES AND MATERIALS FOR
NCDOT C204533 FORSYTH COUNTY: FUTURE I-74 (US 421/I-40 BUS/NC 150)
PROJECT IN VICINITY OF: – KERNERSVILLE, NC 27284 

Please reply To Thalle Construction Co. with your intent or interest.

Deadline of proposals:
Respond with offer by April 20, 2020 12:00 AM.

Proposals are encouraged to be on company letterhead, with scope and pricing noting scope inclusions or exclusions, contact info, and applicable business utilization participation.

Respond to:
quotes@thalle.com;
Fax 919-241-1659
Corp Phone 919.245.1490
Vincent Zannini Estimating Dept.

SCOPE TRADE & MATERIALS:
Future I-74 Winston-Salem Northern Beltway (US 421/I-40 BUS/NC 150) to US-158 GRADING, DRAINAGE, PAVING, AND STRUCTURE. 0.975 miles Asphalt paving, Milling, rumble-strips, Guardrail, fencing, Pavement-markings & striping, storm-& Road-drainage, RCP, CMP, Steel Pipe, frame & coves, geotextiles, civil materials, erosion-control, seeding, reforestation, river- restoration, traffic control, portable concrete barrier, aggregates, boulders, riprap, borrow, trucking, cast-in-place concrete, Cast-in-place- box-culvert, reinforcement, dewatering/bypass, Precast-Segmental-block gravity wall, surveying, Jack and bore. Project availability June 1, 2020, and complete April 30, 2022 see special provision for Intermediate contract times and restrictions.

Letting Date April 21, 2020 – call order 004 Project ID: 34839.2.11 T.I.P U-2579BA FED-Aid No.0074229.

BID DOCUMENTS:
Project Special Provisions-Specifications, Plan Drawings, can be downloaded – https://securecc.smartinsight.co/#/PublicBidProject/507938 In addition NCDOT Standard Specifications, Standards and project documents can be obtained from NCDOT website and can also be obtained/viewed by appointment at NCDOT Division offices, NCDOT central letting webpage, Construction Resource Center(s) of NC, and at Thalle’s office in Hillsborough NC.

BUSINESS UTILIZATION:
MBE/WBE/DBE firms are encouraged to participate & will be listed at time of bid, Work & materials may be combined or divided to facilitate maximum participation. Subcontractors are obliged to sublet to 2nd & 3rd tier DBE subcontractors. DBE firms needing assistance with obtaining bonding, loan capital, lines of credit, insurance, quickpay & payment-agreements, obtaining equipment & supplies materials or negotiate joint venture & partnership arrangements can contact Nan Sumner nsumner@thalle.com for assistance & terms. Thalle will negotiate fairly with interested DBE firms & will not reject firms as unqualified without sound reasons based capabilities.

Print Friendly, PDF & Email