New Hanover County Public School System’s Trask Middle School Project

by March 20, 2019

ADVERTISEMENT FOR BIDS

ATTENTION MINORITY/HUB CONTRACTORS:

Barnhill Contracting Company has been selected as the Construction Manager at Risk for the New Hanover County Public School System’s Trask Middle School project and will be conducting the following MWBE Informational Session. You are encouraged to attend the following session to learn more about project participation opportunities available to you. Informational Session will be held on Monday, March 25 2019 at 3:00 PM. This session will be held in the large meeting room at the Board of Education Center, located at 1805 S. 13th Street, Wilmington, NC 28401. These seminars will help to: Learn about the project and the scope of the bid packages; Inform and train Minority/HUB contractors in preparation for bidding this project; Assist in registration on the State of North Carolina Vendor link; Stimulate opportunities for Networking with other firms. The targeted bid date is April, 2019. This project is a 92,365 square feet single story existing Middle School. The project consists of renovations to the following existing areas: Administration areas with new entry vestibule, Media Center, Class Rooms, bathroom & locker room renovations, gymnasium, courtyard and cafeteria improvements. Work is for New Hanover County Schools located on the existing Trask Middle School Campus located at 2900 N College Road, Wilmington NC 28405. On-site and off-site construction shall consist of grading, storm drainage, utilities, site improvements, paving, landscaping, and fencing. Selective interior demolition and abatement.  Building interiors are to consist of CMU, drywall, acoustical ceilings, VCT flooring, porcelain tile and bleacher replacement. Renovations will be constructed of load bearing CMU exterior light gauge metal framing, metal panel exterior, and curtain wall assemblies. The interior shall consist of acoustical ceilings, outdoor pavers, carpet and casework. Media center interior wall systems will be a mix of CMU partitions, GWB partitions. The new classroom renovation portion of the project will consist of light demolition, acoustical ceilings, solid surface casework, painting, flooring, and building specialties. The existing restroom renovations will consist of the demolition and replacement of existing toilet fixtures, specialties and finishes to accommodate all new construction. A new clerestory will be added above classrooms. The roofing for entire school will consist of a low slope PVC roof overlay with roof drains and scuppers. Plumbing, HVAC and Electrical replacements will be made. Prequalification forms will be available at the seminar. Prequalification forms can also be found on our online plan room at www.barnhillplanroom.com under the Trask Middle school project under Public Jobs. Barnhill Contracting Company is dedicated to ensuring Historically Underutilized Business & Minority Business participation in this project and would like to show our support of your business through our MWBE Informational Session.

Print Friendly, PDF & Email