New Orleans Place Drainage Improvements

by July 9, 2019

REQUEST FOR SUBCONTRACT
AND SUPPLIER BIDS

Project:
New Orleans Place Drainage Improvements

Location:
Wilmington, NC

Engineer:
City of Wilmington
PO Box 1810
Wilmington, NC 28402

Bid Date:
July 16th, 2019 at 3:00 p.m.

Contractor:
State Utility Contractors, Inc.

Estimator:
Justin Collins

Email:
jcollins@sucontractors.com

Scope Due by:
July 15th, 2019 at 5:00 p.m.

We are requesting quotations for the following trades/disciplines:

EROSION CONTROL
ASPHALT PAVING REPAIRS
SEEDING & MULCHING
MATERIAL HAULING
CONCRETE REPAIR
STONE SUPPLY
TRAFFIC CONTROL
PIPE AND MISC SUPPLY
SURVEYING
CLEARING
CURB & GUTTER                            

Check the appropriate box below indicating whether or not you plan to submit a bid on this project and FAX or EMAIL it back to us within 48 hours of receipt.

Documents can be reviewed or purchased from:
State Utility Contractors, Inc.,
4417 Old Charlotte Hwy.,
Monroe, NC 28110
(704) 289-6400

State Utility Contractors, Inc.
website – www.sucontractors.com
login:  line

Purchasing Division:
305 Chestnut Street 2nd Floor,
Wilmington, NC

Purchased from
Duncan Parnell
Wilmington, NC
(910) 341-3005

Please mark your response below and FAX this sheet back, or reply to this sender by MAIL or by E-MAIL:                 

Please notify our firm by letter that you are a certified MBE or WBE.

o  Will Bid
Company Name:
________________________________________

Phone:
________________________________________

o  Will NOT Bid
Contact:       ________________________________________
Trades/Discipline:        _________________________________________
Phone:
________________________________________
Fax:
___________________________________________
Email:
___________________________________________

Note:

  1. State Utility has established a quick pay agreement policy for this project to enable subcontractors and suppliers to meet cash flow demands.  If your firm is interested in quoting any of the items above, or any work related to this type of construction, we request that you contact us the number shown above.  Quantities and scope of work will be supplied, if available, upon request.
  2. State Utility is willing to break down or combine elements of work into economically feasible units on a case-by-case basis, and will negotiate in good faith effort with any firm that is interested in doing so.
  3. State Utility is willing to facilitate a joint venture between MBE’s to help them to be able to bid the present project.  Contact us if you need help with this matter.  If the job is too big for you or you need help to quote a complete package.
  4. State Utility is willing to aid MBE’s in obtaining financial assistance for the project.
  5. State Utility is willing to assist MBE’s in getting their own bond or insurance for this city contract or others if needed.
  6. State Utility is willing to cover MBE’s under our insurance and bond.  Contact us or make it evident on your quote that you need this included.

 

Print Friendly, PDF & Email