NWC Exterior Hydronic Piping Project and RP2 Equipment Addition

by February 12, 2019

ADVERTISEMENT FOR PRE-QUALIFIED BIDDERS

 Sealed Contractor Qualification Statements will be received until March 1, 2019 at 4:00 PM in Building D, room ND 349 on the Northern Campus of Wake Technical Community College to pre-qualify general contractors for the opportunity to bid on the construction of the NWC Exterior Hydronic Piping Project and RP2 Equipment Addition.  The Project is on Wake Technical Community College’s north campus on Louisburg Road in Raleigh NC.   The Regional Plant 2 (RP-2) supports the cooling and heating needs of campus as one of the three (3) utility plants on campus.  RP-2 was designed to accept a total of three chillers, cooling towers, and boilers.  This project installs the second of the chillers, cooling towers, boilers, pump and support equipment.  The project also includes building the frame system supporting a third chiller, but not the chiller itself.  Along with the equipment in RP-2, new underground heating hot water (HHW) and chilled water (CHW) piping will be extended from the existing man hole MH-11 to the existing Building H along the east side of Building F and under the existing Pedestrian Bridge 1, as well as toward a future Automotive building for connection to that projects hydronic system.

Contractors will be required to submit the State of North Carolina Prequalification form for Prime Contractors along with any additional pertinent information to identify their qualifications to perform the work.

Proposers must pre-qualify to submit bids and the project will be bid as a single prime contract.   The college reserves the unqualified right to reject any or all qualification statements and to wave informalities.

Wendell Goodwin
Vice President of Facilities Operations
Wake Technical Community College

Print Friendly, PDF & Email