Port of Wilmington Upgrades to the South Gate Complex

by August 8, 2019

ATTENTION MINORITY/HUB CONTRACTORS

Barnhill Contracting Company has been selected as the Construction Manager at Risk by the North Carolina State Ports Authority for the Port of Wilmington Upgrades to the South Gate Complex project and will be conducting an Informational Session to help brief about the project and the scope of the bid packages. You are encouraged to attend the following session to learn more about project participation opportunities available to you.  This meeting will be held on Tuesday, August 27, 2019 at 5:30 PM, in the conference room of the Materials Management Building at the Port of Wilmington, located at 2508 Burnett Blvd, Wilmington, NC 28402.  Parking is available and free for this meeting.

This session will help to: Learn about the project and the scope of the bid package; Inform and train Minority/HUB contractors in preparation for bidding this project; Assist in registration on the State of North Carolina Vendor link; and stimulate opportunities for networking with other firms.

This project is located in Wilmington, NC, and consists of a new 8,000 sf control building, and over ten acres of site work.  Construction includes premanufactured booths and canopies, Asphalt & Concrete Paving, and infrastructure for multiple locations of security and weighing of traffic in and out of the South Gate of NC Port of Wilmington.  The civil work consists of development of an existing asphalt paved storage area, to a fully functional truck terminal, including site utilities, milling and asphalt paving along with concrete paving.  The building consists of structural steel with slab on deck 2nd floor and Roof, with Modified Bit Roofing.  The skin will be metal studs, sheathing, air barrier, masonry and insulated metal panels, including Curtainwall and Storefront windows.  Interiors will be resilient, carpet, and ceramic tile flooring, drywall and acoustical ceilings, wood doors and hardware, casework, and signage.  Landscaping consists of seeding/sod and irrigation.  Final phase consisting of demolition of existing structures onsite, utility removal and asphalt patch back.  Prequalification forms can be found on our online plan room at www.barnhillplanroom.com under the Port of Wilmington – South Gate Complex project under Public Jobs. Prequalification forms will be accepted until September 9, 2019.  If you plan on attending, please RSVP by e-mailing Anthony Skubic at askubic@barnhillcontracting.com .  Barnhill Contracting Company is dedicated to ensuring Historically Underutilized Business & Minority Business participation on this project and would like to show our support of your business through our MWBE Informational Session.

Print Friendly, PDF & Email