Statesville Middle School Upgrades project

by August 5, 2020

ADVERTISEMENT FOR BIDS

STATESVILLE MIDDLE SCHOOL UPGRADES
IREDELL-STATESVILLE SCHOOLS
321 CLEGG STREET
STATESVILLE, NC 28677

Sealed bids from General Contractors for the construction of the Statesville Middle School Upgrades project will be received and read aloud on Tuesday, August 25, 2020 at 2:00 PM at the Statesville Middle School. Iredell-Statesville Schools reserves the right to reject any and all bids.

The scope of work identified by the construction documents will include but not be limited to upgrades to mechanical, plumbing, electrical, fire protection in addition to new toilet facilities, locker rooms, gymnasium finishes/equipment and various ADA improvements. Civil improvements include new accessible walks, parking & bus lots, dock access, queue road, water service, and grease trap. Also included will be a new drop off and loading area, required stormwater facilities and storm drainage systems.

The project will be constructed under a single prime contract with an anticipated Notice to Proceed of September 15, 2020 with an eight (8) month project duration.  The school will be void of all students and faculty during this time.

A non-mandatory Pre-Bid conference will be held at Statesville Middle School on Tuesday, August 11, 2020 at 10:00 AM. COVID 19 precautions will be enforced and access to the school will be permitted after.

Email Jim Palmieri, AIA, FWA Group, at j.palmieri@fwagroup.com for access to digital construction documents (drawings & specifications).  (m) 704.995.4020.

 

Print Friendly, PDF & Email