UNCH 3 Anderson North Patient Unit
by Contributing Writer(s) 08/25/2016ADVERTISEMENT FOR BIDS
Sealed proposals will be received until 2:00 PM, on September 22, 2016, in the Conference Room at UNC Hospitals’ Plant and Engineering Department, 9th Floor, Bed Tower, 101 Manning Drive, Chapel Hill, North Carolina 27514, for the construction of UNCH 3 Anderson North Patient Unit, at which time and place bids will be opened and read.
Complete plans and specifications for this project can be obtained in PDF format free of charge from MHAworks, PA, 501 Washington Street, Suite G, Durham, NC 27701, (919) 682-2870, during normal office hours after August 25, 2016. Hard copies will not be issued.
The state reserves the unqualified right to reject any and all proposals.
PRE-BID MEETING
An open pre-bid meeting will be held for all interested bidders and vendors on September 1, 2016 at 2:00 PM, at the Plant and Engineering Department, 9th Floor Conference Room, 101 Manning Drive, Chapel Hill, North Carolina 27514, 2:00 PM. to identify preferred brand alternates and their performance standards that the Owner will consider for approval on this project. Attendance at this conference is mandatory.
Bids will be received for a single Prime Contract.
The following General Contractors are Pre- qualified:
- T. Wilson Construction
- Danis Construction Company
- DeVere Construction
- M. Jordan/Bordeaux
- LeChase Construction
- Lomax Construction
- Monteith Construction
The Fire Protection, Plumbing and Electrical trades will be open bid. The owner reserves the unqualified right to reject any and all proposals.
Designer:
Brian A. Maxwell, RA
MHAworks, PA
501 Washington Street, Suite G
Durham, NC 27701
Signed:
Cleopatrice Robinson, Project Manager
Plant Engineering
UNC Hospitals
101 Manning Drive
Chapel Hill, NC 27514