UNCW P3 Student Village

by September 5, 2018

NOTICE TO HUB SUBCONTRACTORS

 UNCW P3 STUDENT VILLAGE

HUB Outreach Meeting:  Meeting will be held on September 27, 2018 from 4:00 to 6:00 pm McNeil Hall Rm # 1051, located on the UNCW Campus.

The Overall project includes the construction of (4) new student housing facilities and (1) new utility outbuilding being constructed over two phases.  Building 1 and 2 are to be constructed during Phase 1, each are 388 bed semi-suite style, 5 story structures with multipurpose areas totaling 104,000 GSF(ea). Buildings 3 and 4 are to be constructed during Phase 2, immediately following completion of Phase 1, each are 519 bed community pod style, 4 story structures with retail food concepts totaling 105,000 GSF(ea).

Balfour Beatty Construction, has been selected as the Construction Manager at Risk for this project and will receive bids from and contract with the principal and specialty contractors for the execution of the work. Historically Underutilized Businesses are encouraged to participate, however the firm must be certified by the Office for Historically Underutilized Businesses (HUB Office) through the Statewide Uniform Certification (SWUC) program. You may begin the certification process at the following website: http://www.doa.nc.gov/hub/ .

The following is the list of Bid Packages for this project; General Trades, Building Concrete, Masonry, Structural Steel, Millwork, Casework, Waterproofing and Caulking, Roofing, Fireproofing, Metal wall Panels, Doors and Hardware, Glass and Glazing, Residential Windows, Metal Framing and Drywall, Acoustical Ceilings, Paint, Flooring, Tile, Toilet Partitions and Accessories, Signage, Appliances, Window Treatments, Canopy, Fire Protection, Plumbing, HVAC, Controls, Electrical, Communications, Earthwork, Paving and Striping, Hardscape and Landscape.

Contact Dave Goltz @ dgoltz@balfourbeattyus.com with any questions.

 

Print Friendly, PDF & Email