US 70 – (Havelock Bypass) From North of Pine Grove to North Carteret County Line – C204177

by June 26, 2019

REQUEST FOR QUOTE FOR CONSTRUCTION
OF NCDOT CARTERET/CRAVEN COUNTIES

US 70 – (HAVELOCK BYPASS) FROM NORTH OF PINE GROVE TO NORTH CARTERET COUNTY LINE. – C204177
RESPOND WITH YOUR INTENT TO QUOTE

Contacts / Respond to:
Thalle Construction Company. By July 12, 4 pm C/O: Adrienne Duncan quotes@thalle.com or aduncan@thalle.com  (P: 919.241.2145).

Project Description:
GRADING, DRAINAGE, PAVING, AND STRUCTURES, 10.353 miles – the Havelock Bypass will be a four-line , median divided highway that will provide a high speed alternative to using US 70 though Havelock and includes major actives and specialty items; Borrow , Reinforced Concrete Deck Slab, Class A Concrete Bridge, 54″ Prestressed Concrete Girders, clearing and grubbing, grading, asphalt paving ,Guardrail, Signing, Pavement Markings, Erosion Control, Reforestation, Signals/ITS systems.

Bid Documents:
Are available from Thalle Construction online plan room https://secure.smartinsight.co/#/PublicBidProject/420635 can also be obtained/viewed by appointment at NCDOT Division offices, NCDOT central letting webpage, Construction Resource Center(s) of NC, and at Thalle’s office in Hillsborough NC.

Divisions of work:
Office-trailer, sanitary services, surveying, earthwork, concrete, bridge work piping, clearing and grubbing, Pilings, asphalt, stone and aggregates, erosion control, traffic control, signage, trucking, electrical, permanent signage, reforestation, , utilities installation, geotechnical services, pavement striping, guard rails.

Business Utilization:
MBE/WBE/DBE firms are encouraged to participate & will be listed at time of bid, Work & materials may be combined or divided to facilitate maximum participation. Subcontractors are obliged to sublet to 2nd & 3rd tier DBE subcontractors. DBE firms needing assistance with obtaining bonding, loan capital, lines of credit, insurance, QuickPay & payment-agreements, obtaining equipment & supplies materials or negotiate joint venture & partnership arrangements can contact Thalle for assistance. Thalle will negotiate fairly with interested DBE firms & will not reject firms as unqualified without sound reasons-based capabilities. DBE Goal is 9% on this project.

Print Friendly, PDF & Email