USDA Water System Improvements, Contract No. 2 – Wells 9 and 10

by September 12, 2019

ADVERTISEMENT FOR BIDS

JONES COUNTY
P.O. BOX 340
TRENTON, NC 28585
USDA WATER SYSTEM IMPROVEMENTS
CONTRACT NO. 2 – WELLS 9 AND 10

Sealed Bids for the construction of the USDA Water System Improvements, Contract No. 2 – Wells 9 and 10 will be received by Jones County at the Commissioner’s Board Room, 110 Market Street, Trenton, NC 28585 until 2:00 PM local time on October 15, 2019, at which time the Bids received will be publicly opened and read.

Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form.

This issuing Office for the Bidding Documents is: McDavid Associates, Inc., 109 East Walnut Street, P.O. Box 1776, Goldsboro, NC 27533-1776. The Issuing Office contact person is the Project Engineer, David E. Gurley, III, whose telephone number is (919) 736-7630. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. and 5:00 p.m., and may obtain copies of the Bidding Documents from the Issuing Office as described below.

Bidding Documents also may be examined at the following locations: 

Jones County Administration Building,
418 Hwy 58 N,
Trenton, NC 28585

Dodge Data and Analytics,
4300 Beltway Place,
Suite 150,
Arlington, TX 76018-5253
(View Online at www.construction.com)

Construct Connect,
Attn: DPC,
30 Technology Parkway South,
Suite 100,
Norcross, GA 30092
(View Online at www.constructconnect.com)

Construction Journal,
400 SW 7th Street,
Stuart, FL 34994
(View Online at www.constructionjournal.com)

Builders & Contractors Exchange, Inc.,
1118 Azalea Garden Road,
Norfolk, VA 23502-5612
(View Online at www.bceva.com)

Printed copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon a non-refundable payment of $175.00 for each set. Checks for Bidding Documents shall be payable to “McDavid Associates, Inc.”. Upon request and receipt of the non-refundable payment indicated above, the Issuing Office will transmit the Bidding Documents via delivery service. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder’s date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.

The Owner reserves the right to reject any and all Bids.

Bidder shall be properly licensed under Chapter 87, General Statutes of North Carolina.

Small, minority, women’s, and disadvantaged businesses and labor surplus area firms are encouraged to submit Bids.

This Project is subject to the good faith efforts and goals for participation by minority businesses required by G.S. 143-128.2.  The Owner has adopted a verifiable ten percent (10%) goal for participation by minority businesses in the total value of the Work.

Bidders shall, within the time frames specified in the Bid documents, submit all required affidavits and documentation demonstrating that the Bidder made the required good faith effort in compliance with G.S. 143-128.2.  Failure to file all required affidavits and documentation within the required time frames is grounds for rejection of the Bid.

Prospective Bidders who have been found guilty of discrimination within the last two (2) years are debarred from bidding.

A pre-bid conference will be held at 10:00 AM local time on October 1, 2019 at the Commissioners Board Room, 110 Market Street, Trenton, NC 28584. Attendance at the pre-bid conference is highly encouraged but is not mandatory.  Prospective Bidders are encouraged to attend this pre-bid conference as part of their good faith efforts.

Bid security shall be furnished in accordance with the instructions to Bidders.

Owner:
Jones County

By:
W.
Michael Haddock

Title:
Chairman

Date:
September 12, 2019

Print Friendly, PDF & Email