Wake County Schools project: Buckhorn Creek Elementary (E45)

by 12/08/2016

NOTICE TO SUBCONTRACTOR

BIDDER PRE-QUALIFICATION REQUEST
for the WCPSS –Buckhorn
Creek Elementary (E45)

Balfour Beatty Construction is seeking to pre-qualify principal trade and specialty contractors to submit bids for the furnishing of labor, material, and equipment for the following Wake County Schools project: Buckhorn Creek Elementary. Balfour Beatty Construction has been selected as the Construction Manager at Risk for this project and will receive bids from and contract with the principal and specialty contractors for the execution of the work. Historically Underutilized Businesses are encouraged to participate, however the firm must be certified by the Office for Historically Underutilized Businesses (HUB Office) through the Statewide Uniform Certification (SWUC) program. You may begin the certification process at the following website: http://www.doa.nc.gov/hub/

Similar project experience will be considered during prequalification. Anticipated Bid Dates will start March 2017. Submittals for prequalification forms may be hand delivered, mailed, or submitted electronically. Deadline for prequalification is 10 days prior to Bid Date, however prompt response is preferred. The CM and Owner reserve the right to reject any and all Pre-qualifications. Contracting method will be through Competitive Public Bid in accordance with Chapter 143 of the NC General Statues. For further information or questions, please contact John Wilkins at 919-270-1914, or by email at [email protected]. Prequalification documents can be accessed through the following link:
https://bbcus.egnyte.com/dl/dDurm5Tw8R/Buckhorn_Creek_Elem_Prequal.pdf_
Mailed or hand delivered submittals shall go to the following address: John Wilkins Balfour Beatty Construction 406 South McDowell Street, Suite 200 Raleigh, NC 27601.

Project specific bid packages with preliminary budgets can be found below for the Buckhorn Creek School Project. General trades BP-01A 120K, Final Cleaning BP-01B 27K, Site Concrete BP-02A 175K, Fencing BP-02B 98K, Landscaping BP-02C 800K, Turnkey Site Package BP-02D 5.4M, Bldg Concrete BP-03A 1M, Masonry BP-04A 2.3M, Steel BP-05A 1.9M, Casework BP-06A 330K, Waterproofing BP-07A 100K, Roofing BP-07B 1.2M, Doors/Frames/Hardware BP-08A 400K, Overhead Doors BP-08B 10K, Aluminum Store Front and Curtainwall BP-08C 580K, Drywall BP-09A 1.1M, Tile BP-09B 82K, Acoustical BP-09C 200K, Flooring BP-09D 300K, Painting BP-09E 102K, Specialties BP-10A 202K, Signage BP-10B 23K, Operable Partitions BP-10C 63K, Toilet Partitions BP-10D 30K, Canopies BP-10E 65K, Food Service Equipment BP-11A 243K, Window Treatments BP-12A 20K, Elevators BP-14A 92K, Plumbing BP-15A 1.1M, Fire Protection BP-15B 300K, HVAC BP-15C 1.7M, Plumb/Mech Combo BP-15D 2.8M, HVAC Controls BP-15E 260K, Test and Balance BP-15F 31K, Electrical BP-16A 1.5M, Fire Alarm BP-16B 64K, Telecommunications BP-16C 125K, Security BP-16D 146K, Turnkey Electrical BP-16E 1.8M.

Print Friendly, PDF & Email