NOTICE TO CONTRACTORS

Wiley Magnet Middle School Interior Upfit & Gymnasium Addition Project Address: 1400 W Northwest Blvd, Hawthorne Rd NW, Winston-Salem, NC 27104.

BIDDER PRE-QUALIFICATION REQUEST:
Vannoy Construction has been selected as the Construction Manager at Risk by Winston Salem Forsyth County Schools and is seeking to pre-qualify construction trade and specialty contractors to submit bids for furnishing labor, materials, equipment and tools for the Wiley Magnet Middle School Interior Upfit & Gymnasium Addition.

PROJECT DESCRIPTION:
Demolition of the existing school gymnasium and building a new gymnasium; including two levels: the 1st level (16,125SF) will have an entrance foyer, administration office area, restrooms & gymnasium. The basement level (8,100SF), which is partially above grade, will have four (4) classrooms, locker rooms & restrooms. Approx. 3,000SF of interior renovation of four (4) areas in the existing school building. The existing school gymnasium currently houses boilers that serve the main school building. These will be demolished with the gymnasium structure & two (2) new 3,000 MBH boilers will be installed in a built out mechanical room in the existing school building.

BID PACKAGES (BP) Including BUDGET ESTIMATES (BE):

  • BP099 FINAL CLEANING – BE: $15,000.00
  • BP235 STRUCTURE DEMOLITION/SELECTIVE INTERIOR DEMOLITION/ASBESTOS ABATEMENT –  BE: $120,000.00
  • BP250 DEEP FOUNDATION SYSTEM – BE: $115,000.00
  • BP390 CIP CONCRETE (TURNKEY) – BE: $850,000.00
  • BP400 MASONRY (TURNKEY) – BE: $900,000.00
  • BP500 STRUCTURAL AND MISCELLANEOUS METALS (TURNKEY) – BE: $460,000.00
  • BP640 MILLWORK – BE: $25,000.00
  • BP740 ROOFING – BE: $215,000.00
  • BP790 JOINT SEALANTS, WATERPROOFING, EXPANSION JOINTS – BE: $95,000.00
  • BP800 DOORS, FRAMES, HARDWARE (TURNKEY) – BE: $100,000.00
    • INSTALLATION INCLUDED
  • BP810 FIRE SHUTTERS (TURNKEY) – BE: $35,000.00
  • BP840 GLASS & GLAZING – BE: $30,000.00
    • INTERIOR STOREFRONT
    • MISCELLANEOUS INTERIOR GLAZING
  • BP850 EXTERIOR VINYL WINDOWS – BE: $85,000.00
  • BP920 METAL STUDS, DRYWALL, INSULATION, ACOUSTICAL CEILINGS, EXTERIOR COMPOSITE COLUMNS – BE: $250,000.00
  • BP960 FLOORING & HARD TILE – BE: $300,000.00
  • BP970 WOOD/SPORTS FLOORING – BE: $110,000.00
  • BP990 INTERIOR & EXTERIOR PAINTING & COATINGS – BE: $90,000.00
  • BP1014 SIGNAGE (ROOM INDENTIFICATION PANEL SIGNAGE) – BE: $5,000.00
  • BP1020 MISC ACCESSORIES (TURNKEY) – BE: $30,000.00
    • INSTALLATION INCLUDED
    • PLASTIC TOILET COMPARTMENTS
    • TOILET, BATH, AND LAUNDRY ACCESSORIES
    • FIRE PROTECTION CABINETS
    • FIRE EXTINGUISHERS
  • BP1040 LOCKERS (TURNKEY) – BE: $25,000.00
  • BP1312 TELESCOPING BLEACHERS (TURNKEY) – BE: $102,000.00
  • BP1350 ATHLETICS (TURNKEY) – BE: $60,000.00
    • TELESCOPING WALL MOUNTED BASKETBALL SYSTEMS
    • VOLLEYBALL SLEEVES
    • GYMNASIUM DIVIDER CURTAIN
  • BP1420 ELEVATORS – BE: $70,000.00
  • BP1510 PLUMBING SYSTEMS – BE: $390,000.00
  • BP1520 MECHANICAL SYSTEMS – BE: $1,500,000.00
  • BP1530 FIRE PROTECTION – BE: $95,000.00
  • BP1600 ELECTRICAL SYSTEMS & SITE ELECTRICAL UTILITIES – BE: $800,000.00
  • BP3110 SITE WORK – BE: $500,000.00
    • SITE CLEARING
    • EARTH MOVING
    • STORM UTILITY DRAINAGE PIPING
    • SITE WATER/SEWER UTILITIES
    • TURF & GRASSES
    • TREES

Additional packages may be added and/or deleted at the discretion of the Construction Manager. The design work is nearing completion. The documents should be ready to issue for bid by the first of April. Construction is scheduled to start June 2020.

PRE-QUALIFICATION FORMS CAN BE OBTAINED from Shama Blalock at APWinston@jrvannoy.com .

PRE-QUALIFICATION CUTOFF DATE IS 3/20/2020.

Interested contractors shall submit their completed pre-qualification submittals to:

Shama Blalock
Vannoy Construction
1255 Creekshire Way, Suite 220
Winston Salem, NC 27103
Phone: 336-448-1950
Fax: 336-283-9651