Asheville High School Building G, Asheville NC

by June 17, 2021

ADVERTISEMENT FOR BIDS

Project:
Asheville High School Building G, Asheville NC.

Bid Date:
July 1, 2021 @ 11:00 a.m.

Contact:
Brandon Harrison
828-754-6431
[email protected]

Wilkie Construction Co. LLC would like to invite you to quote the Asheville High School Building G project. The scope of this project will include the following trades selective demolition, cast in place concrete, unit masonry, structural steel, fabricated steel, reinforcing steel, sheathing, fiberglass reinforced wall panels, dampproofing, water proofing, roof accessories, firestopping, joint sealants, hollow metal doors and frames, flush wood doors, hardware, glazing, non-structural metal framing, wall systems, tiling, acoustical ceilings panels, resilient flooring, resilient base, resinous flooring, painting, visual display units, signage, toilet accessories and partitions, metal lockers, canopies and sunshades, gymnasium equipment, roller window shades, machine room-less electrical traction elevators, plumbing, HVAC, electrical, fire alarm systems, excavation and backfill, sidewalks, curb and gutters, and sanitary sewer. The bid date for this project is July 1, 2021, but Wilkie would like to request pricing as soon as possible.

Please contact our office at 828-754-6431 to request a link to view plans and specifications on this project.

Print Friendly, PDF & Email