CLT Concourse A Expansion – Phase 2 project located in Charlotte, NC

by September 28, 2021

NOTICE TO CONTRACTORS

BIDDER PRE-QUALIFICATION REQUEST

JE Dunn Construction has been selected as the Construction Manager by the Charlotte Douglas International Airport in Charlotte, North Carolina, and is seeking to pre-qualify construction trade and specialty contractors to submit bids for furnishing labor, materials, equipment, and tools for the CLT Concourse A Expansion – Phase 2 project located in Charlotte, NCPROJECT DESCRIPTION: Construction of a new 191,000 SF, 10 Gate Concourse at the Charlotte Douglas International Airport.  Construction will mostly be on the Non-Secure side of the airport and will NOT require badging (with the exception of Baggage Handling System and Phase 1 MEP / Enabling Work) and is planned to be built during typical construction work hours. Construction is scheduled for early summer 2022 with completion in the summer of 2024. Principal trade and specialty contractors are solicited for the following Bid Packages: 124 Final Clean, 128 General Trades, 129 Employee Shuttling, 130 Daily / Composite Clean + Dumpsters, 02B Selective Demolition, 03C Concrete Structure, 04A Unit Masonry, 05A Structural and Miscellaneous Steel, 05D Ornamental Metals, 06E Millwork and Finish Carpentry, 07B Dampproofing and Waterproofing, 07E Metal Roofing, 07F Exterior Wall Paneling, 07G Membrane Roofing and Metal Roofing, 08A Doors, Frames, and Hardware, 08D Overhead Doors and Grilles, 08F Glazing, 08H Skylights, 08I Louvers and Vents, 09A Plaster, Gypsum Board, and Wall Panels, 09B1 Painting and Coating Level 1, 09B2 Painting and Coating Levels 2-3, 09C Tiling, 09F Acoustical Ceilings, 09H Flooring, 09D Terrazzo, 10 Life Safety Specialties, 10G Signage – Digital & Lit, 10J Signage – Static Plaque, 10P Toilet Accessories, 11A Loading Dock Equipment, 11H Fall Protection, 13I Baggage Handling System, 14A Elevators Escalators and Moving Walks, 21A Fire Suppression, 22A Plumbing, 23A HVAC, 26A Electrical, 27A Communications Low Voltage and Security, 31C Earthwork, 31E Augercast Piles, 32B Site Concrete and Concrete Paving, 32G Landscaping and Irrigation, 32H Fencing. A complete listing will be included in the Pre-Qualification Package and additional packages may be added, modified and/or deleted at the discretion of the Construction Manager. DBE, historically underutilized and minority business participation is strongly encouraged.  Interested contractors should submit their completed prequalification Package by October 28, 2021, to Brian Fromal at JE Dunn Construction, 1616 Camden Rd. Suite 400, Charlotte, NC 28203 or [email protected] . Pre-Qualification Form can be obtained at electronically at www.jedunn.com/cap2 .

Print Friendly, PDF & Email