Eva Perry Regional Library HVAC Replacement project, located in Apex, NC

by April 7, 2021

NOTICE TO BIDDERS

Sealed proposals will be received by the County of Wake in the Purchasing Department, Suite 2900, Wake County Justice Center, 301 McDowell Street, Raleigh, NC 27601, up to 2:00 p.m., Thursday May 6th, 2021, and immediately thereafter publicly opened and read for providing labor, material and equipment entering into the construction of the Eva Perry Regional Library HVAC Replacement project, located in Apex, NC.  Complete contract documents will be open for inspection in the offices of the Engineer; AGC, Raleigh Branch; F.W. Dodge, Raleigh Branch; North Carolina Institute of Minority Economic Development (NCIMED), Durham; Hispanic Contractors Association of The Carolinas, Raleigh office, North Carolina; or may be obtained from the Engineer upon deposit of One-hundred Dollars ($100.00) in cash or certified check.

The plan deposit will be returned to Contractors submitting bids provided all documents are returned in good condition within ten (10) days after the bid date.  The plan deposit will be returned to Contractors not submitting bids provided all documents are returned in good condition at least five (5) days prior to the bid date.

A mandatory Pre-Bid Conference will be held Tuesday April 27th, 2021 at 2:30 p.m. at the proposed project site, Eva Perry Regional Library, 2100 Shepherds Vineyard Drive, Apex, N.C. 27502.

Wake County provides minorities and women equal opportunity to participate in all aspects of its construction program consistent with NCGS §143-8.  Bidders shall comply with the requirements of the Wake County Minority Business Enterprise Program, as outlined in section 00500 “Minority Business Enterprise Participation in Wake County Building Construction and Repair Contracts” of the Project Manual.

No bid may be withdrawn for sixty (60) days after the scheduled closing time for bids.

The Owner reserves the right to reject any or all bids and to waive informalities.

Signed:
COUNTY OF WAKE

By:
Mark Forestieri, AIA
Director, Facilities Design & Construction

ENGINEER:
Engineered Designs, Inc.
1151 SE Cary Parkway,
Suite 200
Cary, NC  27518
Attn:  John R. Quiocho, PE

Print Friendly, PDF & Email