Frank L. Blum Construction, Inc. has been selected as the Construction Manager @ Risk by North Carolina State University and is seeking to prequalify construction trade and specialty contractors to submit bids for furnishing labor, materials, equipment and tools for the Greek Village Phase 4 Buildings Package project in Raleigh, NC.

PROJECT DESCRIPTION:
Greek Village Phase 4 Buildings Package includes the construction and site infrastructure for three new, residential style buildings located within NC State’s existing Greek Village. The apartment building will be a 56,132 SF, 4-story, wood-framed building with 147 total beds arranged in apartment style suites with a central corridor.  The 3-story Townhouse A is a total of 22,786 SF and will have 75 total beds and will include a commercial kitchen on the ground floor.  Townhouse B has 57 beds at 17,136 SF and will also be 3-stories.  All three buildings will have a combination of brick and cementitious veneer with asphalt shingles and aluminum gutters and an interior elevator for ADA access. Building construction is scheduled to start in Q3 of 2021 and must be completed by early 2023.

There will be a HUB outreach meeting to provide additional information about the project on Monday, May 17, 2021 @ 4 pm.  You can register for this meeting online at  https://flblum.zoom.us/meeting/register/tZcoduGorjItGtGLOHWEAGGu8Dzsk8LmVD3C .

Subcontractors may choose to prequalify for multiple bid packages.

Principal trade and specialty contractors are solicited for the following bid packages:

Bid Package
BP0100
Bid Package Description
General Trades
Estimated Budget
$425,000

Bid Package
BP0174
Bid Package Description
Final Cleaning
Estimated Budget
$45,000

Bid Package
BP0300
Bid Package Description
Turnkey Concrete
Estimated Budget
$550,000

Bid Package
BP0400
Bid Package Description
Turnkey Masonry
Estimated Budget
$1,580,000

Bid Package
BP0500
Bid Package Description
Turnkey Structural & Miscellaneous Steel
Estimated Budget
$475,000

Bid Package
BP0611
Bid Package Description
Wood Framing
Estimated Budget
$2,200,000

Bid Package
BP0620
Bid Package Description
Finish Carpentry, Millwork & Casework
Estimated Budget
$410,000

Bid Package
BP0660
Bid Package Description
FRP
Estimated Budget
$100,000

Bid Package
BP0710
Bid Package Description
Caulking & Waterproofing
Estimated Budget
$60,000

Bid Package
BP0720
Bid Package Description
Building Insulation
Estimated Budget
$375,000

Bid Package
BP0746
Bid Package Description
Exterior Siding, Soffits, & Panels
Estimated Budget
$260,000

Bid Package
BP0750
Bid Package Description
Roofing
Estimated Budget
$375,000 

Bid Package
BP0781
Bid Package Description
Fireproofing & Intumescent Paint
Estimated Budget
$20,000

Bid Package
BP0810
Bid Package Description
Turnkey Doors, Frames & Hardware
Estimated Budget
$825,000

Bid Package
BP0840
Bid Package Description
Storefronts & Glazing
Estimated Budget
$35,000

Bid Package
BP0850
Bid Package Description
Windows
Estimated Budget
$240,000

Bid Package
BP0920
Bid Package Description
Gypsum Board Assemblies
Estimated Budget
$1,050,000

Bid Package
BP0930
Bid Package Description
Hard Tile
Estimated Budget
$20,000

Bid Package
BP0950
Bid Package Description
Acoustic Ceilings
Estimated Budget
$45,000

Bid Package
BP0960
Bid Package Description
Resilient & Carpet Flooring
Estimated Budget
$750,000

Bid Package
BP0984
Bid Package Description
Acoustical Panels
Estimated Budget
$30,000

Bid Package
BP0990
Bid Package Description
Painting
Estimated Budget
$655,000

Bid Package
BP1000
Bid Package Description
Specialties
Estimated Budget
$140,000

Bid Package
BP1236
Bid Package Description
Countertops
Estimated Budget
$150,000

Bid Package
BP1420
Bid Package Description
Conveying Systems
Estimated Budget
$400,000

Bid Package
BP2100
Bid Package Description
Fire Protection
Estimated Budget
$540,000

Bid Package
BP2200
Bid Package Description
Plumbing
Estimated Budget
$2,200,000

Bid Package
BP2300
Bid Package Description
HVAC
Estimated Budget
1,800,000

Bid Package
BP2600
Bid Package Description
Electrical & Fire Alarm
Estimated Budget
$3,030,000

Bid Package
BP2621
Bid Package Description
Cabling
Estimated Budget
$330,000

Bid Package
BP3100
Bid Package Description
Sitework
Estimated Budget
$270,000

Bid Package
BP3213
Bid Package Description
Concrete Sidewalks
Estimated Budget
$120,000

Bid Package
BP3300
Bid Package Description
Site Utilities
Estimated Budget
$283,000

Additional packages may be added and deleted by the Owner and Construction Manager.

Frank L. Blum Construction, Inc. has a long-standing commitment to maximize minority and other HUB participation on all of our projects, and we recognize the importance the University of North Carolina places on minority and HUB participation for all of their projects. Our goal is to achieve a minimum of 20% minority participation on this project.

Prequalification forms can be obtained from our online plan room http://www.flblum.com/subcontractors.php .   Completed prequalification forms should be submitted to Kari Hiatt by May 21, 2021 via email (khiatt@flblum.com) or mail (830 NE 25th St., Winston-Salem, NC  27105).  Target bid date is July 2021.

 

Print Friendly, PDF & Email