Renovation of the 2nd floor and Mezzanine floor of the Wake County Office Building Project

by October 22, 2018

INVITATION TO BIDDERS
RE-BID

Sealed proposals will be received by the County of Wake in the Purchasing Department, Room 2900, Wake County Justice Center, 301 S. McDowell Street, Raleigh, NC 27601, up to 3:00 p.m., Thursday, November 8th, 2018, and immediately thereafter publicly opened and read for providing labor, material and equipment entering into the renovation of the 2nd floor and Mezzanine floor of the Wake County Office Building Project, located in Raleigh, NC.

The Work generally consists of an interior upfit of the 2nd floor and Mezzanine floor of the Wake County Office Building.  Scope of work will include incidental plumbing, mechanical, fire protection, and electrical installation as well as partitions and other interior components. Demolition has generally been completed under a separate contract, however there is select demolition included in this scope of work.

Wake County provides minorities and women equal opportunity to participate in all aspects of its construction program consistent with NCGS §143-8.  Bidders shall comply with the requirements of the Wake County Minority Business Enterprise Program, as outlined in Section 00 30 00 of the documents.

Complete Contract Documents (Electronic copy only) may be obtained, during normal office hours, beginning Friday, September 7th, 2018 from:

Little Diversified Architectural Consulting
410 Blackwell Street, Suite 10
Durham, NC 27701
(919) 474-2500
Attn: Anne Lebo, AIA
[email protected]

A mandatory Pre-Bid Conference will be held at 2:00pm on Wednesday, October 31st, 2018 and located at:

Wake County Office Building
337 S. Salisbury Street
Raleigh, NC 27601
11th Floor Facilities Design & Construction Suite
Lg. Conference Room 1118

All Contractors are required to be present. The following Contractors attended the original pre-bid conference held on Sept. 18, 2018, and are not required to attend the October 31st pre-bid conference:

  1. Salisbury and Moore Construction
  2. Progressive Contracting
  3. Harrod & Associates Constructors, Inc.
  4. Riggs-Harrod Builders, Inc.
  5. Riley Contracting Group, Inc.

No bid may be withdrawn for sixty (60) days after the scheduled closing time for bids.

The Owner reserves the right to reject any or all bids and to waive informalities.

Signed:
COUNTY OF WAKE

By:
Mark Forestieri
Director, Facilities Design and Construction

Print Friendly, PDF & Email