Swan Quarter Equipment Shop/Maintenance Office

by 03/12/2024

ADVERTISEMENT FOR BIDS 

Title:
Swan Quarter Equipment Shop/Maintenance Office.

A.R. Chesson Construction:
EC Office is actively soliciting bids for Swan Quarter Equipment Shop/Maintenance Office (Due 03/20/2024 @ 1:00 p.m.).

Project Description:
Site work and new construction of a pre-engineered storage facility in Swanquarter, North Carolina.  Completed plans call for site work for a 5,770-square-foot pre-engineered storage facility; and for the construction of a 5,770-square-foot, three-story above grade, one-story below grade pre-engineered storage facility.

MBE/WBE/SBE/DBE/HUB participation is encouraged.  Elements of the work may be combined or broken down to facilitate minority participation.  Assistance with bonding or insurance requirements as well as quick pay arrangements are available to enable minority contractors to meet cash-flow demands.  Email bids to [email protected] .  Plans/specs available on our website, www.archesson.com/bids.  For more information, contact us at 800-849-4486.  A. R. Chesson Construction is an equal opportunity employer.

Print Friendly, PDF & Email