WCPSS Sanderson High School Emergency Shelter Generator Project, located in Raleigh, NC
NOTICE TO BIDDERS
RFB #24-071
Sealed proposals will be received by the County of Wake in the Purchasing Department, Suite 2900, Wake County Justice Center, 301 McDowell Street, Raleigh, NC 27601, up to 3:00 p.m., Tuesday, September 10, 2024, and immediately thereafter publicly opened and read for providing labor, material, and equipment entering into the construction of WCPSS Sanderson High School Emergency Shelter Generator Project, located in Raleigh, NC. Please note that the Wake County Justice Center is a secure facility. Please allow sufficient time to pass through required metal detection and security checks.
Complete contract documents may be obtained electronically by sending a request to Dewberry Engineers Inc. Contact: David Sherk, [email protected] .
Complete contract documents will be open for inspection in the offices of the Engineer; AGC, Raleigh Branch; F.W. Dodge, Raleigh Branch; North Carolina Institute of Minority Economic Development (NCIMED), Durham; Carolina AGC; McGraw Hill Dodge, Raleigh Branch; Hispanic Contractors Association of The Carolinas, Raleigh office, North Carolina; or may be obtained from the Engineer upon deposit of One Hundred Dollars ($100) in cash or certified check. The plan deposit will be returned to Contractors submitting bids provided all documents are returned in good condition within ten (10) days after the bid date. The plan deposit will be returned to Contractors not submitting bids provided all documents are returned in good condition at least five (5) days prior to the bid date.
A Mandatory Pre-Bid Meeting will be held on Thursday, August 29, 2024, at 1:00 p.m. at Sanderson High School located at 5500 Dixon Drive, Raleigh, NC 27609. Bidders in attendance should meet at the front entrance and you will be guided to our meeting place.
Wake County provides minorities and women equal opportunity to participate in all aspects of its construction program consistent with NCGS §143-8. Bidders shall comply with the requirements of the Wake County Minority Business Enterprise Program, as outlined in the front end specification section 05 MBE Resolution of the Project Manual.
No bid may be withdrawn for sixty (60) days after the scheduled closing time for bids.
The Owner reserves the right to reject any or all bids and to waive informalities.
Signed:
COUNTY OF WAKE
By:
Maged Sedarous, PE, PMP
Project Manager
Facilities Design & Construction
ENGINEER:
Dewberry Engineers Inc.
Attn: David Sherk
2610 Wycliff Rd,
Suite 410
Raleigh, NC 27607
919.215.2010
[email protected]
