COA – Allied Health Sciences Simulation Lab

ADVERTISEMENT FOR BIDS 

Barnhill Building Group LLC, will receive sealed proposals for COA – Allied Health Sciences Simulation Lab on February 11th, 2025 at 2 pm. See the following SCOPE OF WORK:  BP 100 – General Trades, BP 105 – Final Cleaning, BP 925 – Drywall/ ACT/Framing/Siding, BP 960 – Resilient Flooring/Carpet/Base/Epoxy, BP 1005 – Toilet Specialties/Accessories/Division 10, BP 1010 – Signage, BP 1220 – Window Treatments, BP1420 – Elevators BP 2100 – Fire Protection, BP 2200 – Plumbing, BP 2300 – HVAC, BP 2600 – Electrical BP 3290 – Landscaping. Scopes of work may be added and/or deleted at the discretion of the Construction Manager.

Bid Location and Time: Bid opening will be held in the College of the Albemarle Room: AE208 1208 North Road Street, Elizabeth City, NC 27909. Times are as follows: February 11th, 2025, at 2 pm.

Barnhill Building Group, LLC will receive, open, and read publicly all bids received in person in the training room and listed with the virtual viewing at the link to be posted on Barnhill’s Plan Room.

Bids will not be accepted from bidders that are not pre-qualified. No facsimile or email submissions are permitted. Sealed bids are to be hand delivered to the bid opening location noted above or mailed Sealed Bids can be delivered before 1:00pm the day of the bid to the College of the Albemarle at 1208 N Road Street PO Box 2327, Elizabeth City, NC 27909. Attention “William De Feo.”

Clint Hardison is inviting you to a scheduled Zoom meeting.

Topic:
Re-Bid Opening – COA New Health Sciences Building
Time:
Feb 11, 2025, 02:00 PM Eastern Time
(US and Canada)
Join Zoom Meeting
https://barnhillcontracting.zoom.us/j/82916164691
Meeting ID:
829 1616 4691

One tap mobile
+14702509358,,82916164691# US
(Atlanta)

+16465189805,,82916164691# US
(New York)
Meeting ID:
829 1616 4691

Bid Documents can be viewed or downloaded through Barnhill’s online Building Division Plan Room (https://www.barnhillcontractingplans.com/#p/home). 

All Bidders are strongly encouraged to include opportunities for HUB participation wherever possible in their respective Bid submission.  HUB participation is a part of this contract and must comply with all requirements set forth in the Bid Documents. 

The Construction Manager and Owner reserve the right to add pre-qualified bidders. The Construction Manager and Owner reserve the right to reject any and all bids. Should you require additional direction, please call Barnhill Building Group, LLC (Clint Hardison – 252-802-0740).