ECU Howell Science South Building Renovation
CONSTRUCTION BID SOLICITATIONS FROM PREQUALIFIED CONTRACTORS
Muter Construction, the CMR for the ECU Howell Science South Building Renovation, is seeking sealed proposals for the following bid packages: (BP01) General Trades & Site Labor; (BP02) Selective Demo & Abatement; (BP03) Cast-in-Place Concrete; (BP04) Masonry; (BP05A) Structural Steel/Steel Deck/Cold-Formed Metal Framing; (BP05B) Misc. Metals; (BP06) Arch Woodwork/Millwork/ Cabinets/Countertops; (BP07A) Waterproofing/Fluid Applied Membrane/Exp Joints/Join Sealants; (BP07B) Roofing, Phenolic Resin Wall Panels/Soffit Panels/Rainscreen System/Sheet Metal Flashing; (BP07C) Spray-Applied Insulation; (BP07D) Spray Applied Fireproofing; (BP08A) Doors/Frames/ Hardware Installation; (BP08B) Aluminum Storefront/ Mirrors/Glazing/ Curtainwall; (BP09A) Terrazzo Flooring; (BP09B) Drywall/Metal Stud/Plastering/Thermal Insulation; (BP09C) Ceramic Tile; (BP09D) Acoustical Panel Ceilings; (BP09E) Resinous Flooring; (BP09F) Flooring; (BP09G) Painting & Tackable Wall Covering (BP10A) Dimensional Letter Signage; (BP10B) Toilet Accessories, Fire Protection Cabinets (material only); (BP10C) Preservation Cabinets and Grow Rooms; (BP11) Lab Casework/Hoods & Furnishings; (BP12) Roller Window Shades; (BP13) Controlled Environment Rooms; (BP14) Conveying Equipment; (BP21) Fire Suppression; (BP22) Plumbing; (BP23) HVAC; (BP22-23) Plumbing & HVAC Combo; (BP26) Electrical/Communications /Electronic Safety and Security; (BP31) Earthwork/Site Improvements/Utilities; (BP31A) Micro Piles; (BP32) Landscaping/Site Furnishings/Irrigation/Pavers.
Packages will be bid to prequalified contractors only. Sealed proposals will be received until 1:00 pm on May 9, 2024, and must be hand-delivered to:
ECU Facilities Administration
1001 East Fourth Street
Greenville, NC 27858-4354
Early bids may be mailed or hand-delivered to the attention of Brad Milne with the project name labeled on the envelope:
Muter Construction
c/o Brad Milne
111 East Vance St.
Zebulon, NC 27597
Mailed or shipped bids to Muter must be received by 5:00 pm on May 8, 2024. A virtual bid opening will be held via TEAMS directly after receiving bids.
A pre-bid site walk will be held at 10:00 am on April 22, 2024, at Howell Science Complex with a Preferred Brand meeting to follow. Complete plans and specs will be available on April 18 and can be obtained from www.muterconstruction.com or by contacting Brad Milne at [email protected] .
As a woman-owned construction firm, Muter fully supports minority and HUB firm participation in this project and encourages minority subcontractors to submit qualifications and proposals. For questions or to request a prequalification package, please contact Muter Construction at 919-404-8330.