ECU Whichard Building Renovation

CONSTRUCTION BID SOLICITATIONS

FROM PREQUALIFIED CONTRACTORS
ECU WHICHARD BUILDING 

Muter Construction, the CMR for the Whichard Building Renovation, is seeking sealed proposals for the following bid packages: (BP01) General Trades; (BP02) Demo & Abatement; (BP03) Cast-in-Place Concrete; (BP04) Masonry; (BP05) Structural Steel/Steel Decking/Metal Pan Stairs/Misc. Metals; (BP06) Interior Finish Carpentry/Architectural Woodwork/Architectural Cabinets; (BP07A) Waterproofing/Fluid Applied Membrane/Interior + Exterior Expansion Joints/Join Sealants; (BP07B) PVC Roofing/Sheet Metal Flashing + Trim/Roof Specialties/Expansion Joints; (BP08A) Doors/Frames/Hardware/Materials + Installation; (BP08B) Aluminum Storefront/Mirrors/Glazing/ Curtainwall/Aluminum Windows; (BP09A) Drywall/Metal Stud/Thermal Insulation; (BP09B) Ceramic Tiling; (BP09C) Acoustical Panel Ceilings/ Acoustical Metal Ceilings; (BP09D) Flooring; (BP09E) Painting/Staining/High Performance Coatings; (BP10A) Panel Signage; (BP10B) Toilet Partitions/Toilet Accessories/Fire Protection Cabinets/Wall + Door Protection/Materials + Installation; (BP10C) Demountable Partitions; (BP12) Curtains + Drapes; (BP14) Conveying Equipment; (BP21) Fire Suppression; (BP22) Plumbing; (BP23) HVAC; (BP22-23) Plumbing & HVAC COMBO; (BP26) Electrical/ Communications /Electronic Safety + Security; (BP31) Earthwork/Site Improvements/Utilities; (BP32) Landscaping/Site Furnishings/Irrigation/Pavers.

Packages will be bid to prequalified contractors only. Sealed proposals will be received until 2:00 pm on January 14, 2025, and must be hand-delivered to:

ECU Facilities Administration
1001 East Fourth Street
Greenville, NC 27858-4354

Early bids may be mailed or hand-delivered to the attention of Brad Milne with the project name labeled on the envelope:

Muter Construction
c/o Brad Milne
111 East Vance St.
Zebulon, NC 27597

Mailed or shipped bids to Muter must be received by 5:00 pm on January 13, 2025.

A pre-bid site walk will be held at 10:00 am on December 19, 2024, at the site (Wright Circle ECU Campus). Complete plans and specs will be available on December 9, 2024, and can be obtained from www.muterconstructionplans.com or by contacting Brad Milne at [email protected].