Lewis McCormick Field in Asheville, NC

by 04/29/2024

PREQUALIFICATION ADVERTISEMENT

 

Blum Construction and WC Construction have been selected, in a Joint Venture, as the Construction Manager @ Risk by the City of Asheville and is seeking to pre-qualify construction trade contractors to submit bids for furnishing labor, materials, equipment and tools for the Lewis McCormick Field in Asheville, NC.

PROJECT DESCRIPTION:
The project will consist of a renovation and addition to the existing +/-4,000 seat ballpark.  Project scope will include a variety of renovated or new player facilities, a new natural grass field and upgraded sports lighting.  The project will feature many new or renovated fan amenities including new seating areas, new comfort facilities, a new team store and new LED scoreboard.  Modifications to the vehicular drop-off area, entry plaza, site drainage systems, underground utilities and landscaping in and around the additions will be part of the scope.

HUB OUTREACH MEETING:  COA & STATE CERTIFICATION WORKSHOP
  *  Virtual Meeting
When:  May 9, 2024, 05:00 PM Eastern Time (US and Canada).

Register in advance for this meeting:
https://lp.constantcontactpages.com/ev/reg/jskrt4b/lp/5d05dbe1-b264-43b2-8e98-861ae8b1e1e7 .

PREBID & OUTREACH MEETING:  GET YOUR BID IN THE GAME *
  *  Virtual Meeting
When: May 23, 2024, 05:00 PM Eastern Time (US and Canada).

Register in advance for this meeting:
https://flblum.zoom.us/meeting/register/tZUtcO6gpj4rHdCN4T9mdB6lzErnKTx2qH4t .

After registering, you will receive a confirmation email containing information about joining the meeting.

Principal trade contractors are solicited for the following bid packages:

Bid Package
BP024000
Bid Package Description
Demolition
Estimated Budget
$125,000

Bid Package
BP030000A
Bid Package Description
Turnkey CIP Concrete – Foundations
Estimated Budget
$400,000

Bid Package
BP030000B
Bid Package Description
Turnkey CIP Concrete – Vertical
Estimated Budget
$600,000

Bid Package
BP030000C
Bid Package Description
Turkney CIP Concrete – Flatwork
Estimated Budget
$500,000

Bid Package
BP040000
Bid Package Description
Masonry
Estimated Budget
$750,000

Bid Package
BP050000
Bid Package Description
Structural Metals
Estimated Budget
$1,250,000

Bid Package
BP055000
Bid Package Description
Metal Fabrication
Estimated Budget
$175,000

Bid Package
BP064000
Bid Package Description
Architectural Woodwork
Estimated Budget
$200,000

Bid Package
BP071000
Bid Package Description
Dampproofing and Waterproofing
Estimated Budget
$400,000

Bid Package
BP072000
Bid Package Description
Spray Applied Insulation
Estimated Budget
$40,000

Bid Package
BP074100
Bid Package Description
Metal Panels
Estimated Budget
$350,000

Bid Package
BP075000
Bid Package Description
Roofing
Estimated Budget
$175,000

Bid Package
BP081000A
Bid Package Description
Doors, Frames & Hardware – Material
Estimated Budget
$125,000

Bid Package
BP081000B
Bid Package Description
Doors, Frames & Hardware – Labor
Estimated Budget
$20,000

Bid Package
BP083600
Bid Package Description
Overhead Doors
Estimated Budget
$50,000

Bid Package
BP088000
Bid Package Description
Storefront & Glazing
Estimated Budget
$150,000

Bid Package
BP092500
Bid Package Description
Framing and Drywall
Estimated Budget
$275,000

Bid Package
BP093000
Bid Package Description
Hard Tile
Estimated Budget
$100,000

Bid Package
BP095000
Bid Package Description
ACT & Specialty Ceilings
Estimated Budget
$100,000

Bid Package
BP096000
Bid Package Description
Carpet, Resilient Flooring, and Base
Estimated Budget
$100,000

Bid Package
BP096610
Bid Package Description
Rubber Sports Flooring
Estimated Budget
$50,000

Bid Package
BP097050
Bid Package Description
Epoxy Flooring
Estimated Budget
$25,000

Bid Package
BP099000
Bid Package Description
Painting & Coatings
Estimated Budget
$175,000

Bid Package
BP101000
Bid Package Description
Signage
Estimated Budget
$100,000

Bid Package
BP102800A
Bid Package Description
Toilet, Bath and Laundry Accessories – Material
Estimated Budget
$35,000

Bid Package
BP102800B
Bid Package Description
Toilet, Bath and Laundry Accessories – Labor
Estimated Budget
$7,500

Bid Package
BP105100
Bid Package Description
Lockers
Estimated Budget
$75,000

Bid Package
BP107000
Bid Package Description
Awnings & Canopies
Estimated Budget
$100,000

Bid Package
BP107500
Bid Package Description
Flagpole
Estimated Budget
$10,000

Bid Package
BP110000
Bid Package Description
Athletic Equipment
Estimated Budget
$375,000

Bid Package
BP111300
Bid Package Description
Audio-Visual Equipment
Estimated Budget
$1,000,000

Bid Package
BP114000
Bid Package Description
Food Service Equipment
Estimated Budget
$125,000

Bid Package
BP126300
Bid Package Description
Stadium Seating
Estimated Budget
$150,000

Bid Package
BP210000
Bid Package Description
Fire Suppression
Estimated Budget
$150,000

Bid Package
BP220000
Bid Package Description
Plumbing
Estimated Budget
$1,000,000

Bid Package
BP230000
Bid Package Description
HVAC
Estimated Budget
$1,500,000

Bid Package
BP260000
Bid Package Description
Electrical
Estimated Budget
$2,000,000

Bid Package
BP271000
Bid Package Description
Low Voltage Systems
Estimated Budget
$150,000

Bid Package
BP312200
Bid Package Description
Sitework
Estimated Budget
$1,250,000

Bid Package
BP321200
Bid Package Description
Paving
Estimated Budget
$125,000

Bid Package
BP321800
Bid Package Description
Athletic Fields
Estimated Budget
$1,500,000

Bid Package
BP323100
Bid Package Description
Fences & Gates
Estimated Budget
$200,000

Bid Package
BP323200
Bid Package Description
Soil Nailing
Estimated Budget
$700,000

Bid Package
BP328000
Bid Package Description
Landscaping & Irrigation
Estimated Budget
$75,000

Additional packages may be added or deleted by the Owner and Construction Manager.

Blum Construction and WC Construction have a long-standing commitment to maximize minority and other HUB participation on all our projects, and we recognize the importance the City of Asheville places on minority and HUB participation.  Historically underutilized and minority business participation is strongly encouraged.  Blum Construction has the ability to create custom solutions to support a successful project outcome.  Examples of Trade Partner Support:  quick pay arrangements, modified insurance limits, bonding access or alternative bonding solutions, joint check agreements, prequalification assistance, disaggregation of bid packages, alternate options for financial statements prequalification requirements, break out of materials and equipment to support cash flow.

Prequalification forms can be obtained through our online plan room via this link https://www.flblum.com/subcontractors/ Completed prequalification forms should be submitted to Alex Carroll by June 7, 2024.  For any questions, please contact Alex Carroll via email ([email protected]) .  Target bid date is July 2024.

Print Friendly, PDF & Email