2023 Water System Improvements Contract No. 2 – Elevated Storage Tank Painting

by 03/26/2024

ADVERTISEMENT FOR BIDS 

Town of Bolton
                                 Owner
221 Ninth Street
                               Address
Bolton, NC 28423                                                             

Separate sealed BIDS for the construction of 2023 Water System Improvements Contract No. 2 – Elevated Storage Tank Painting will be received by the ENGINEER at Town Hall, 221 Ninth Street, Bolton, NC 28423 until 2:00 PM Eastern Time, April 30, 2024, and then at said office publicly opened and read aloud.

The CONTRACT DOCUMENTS may be examined at the following locations:

Bolton Town Hall,
221 Ninth Street,
Bolton, NC 28423

McDavid Associates, Inc.,
109 East Walnut Street,
P.O. Box 1776,
Goldsboro, NC 17533-1776

Dodge Data and Analytics,
2860 South State Highway 161,
Suite 160, #501,
Grand Prairie, TX 75052-7361
(View online at www.construction.com)

ConstructConnect,
Attn:  DPC,
30 Technology Parkway South,
Suite 100,
Norcross, GA 30092
(View online at www.constructconnect.com)

Construction Journal,
400 SW 7th Street,
Stuart, FL 34994
(View online at www.ConstructionJournal.com)

Builders & Contractors Exchange, Inc.,
1118 Azalea Garden Road,
Norfolk, VA 23502-5612
(View online at www.bceva.com)

Copies of the CONTRACT DOCUMENTS may be obtained at the office of McDavid Associates, Inc. located at 109 East Walnut Street, P.O. Box 1776, Goldsboro, NC 17533-1776 upon a non-refundable payment of $100.00 for each set.

The OWNER reserves the right to reject any and all BIDS.

BIDDER shall be properly licensed under Chapter 87, General Statutes of North Carolina.

Small, minority, women’s, and disadvantaged businesses and labor surplus area firms are encouraged to submit BIDS.

This PROJECT is subject to the good faith efforts and goals for participation by minority businesses required by G.S. 143-128.2.  The OWNER has adopted a verifiable 10% goal for participation by minority businesses in the total value of the WORK.

BIDDERS shall, within the time frames specified in the BID documents, submit all required affidavits and documentation demonstrating that the BIDDER made the required good faith effort in compliance with G.S. 143-128.2.  Failure to file all required affidavits and documentation within the required time frames is grounds for rejection of the BID.

Prospective BIDDERS who have been found guilty of discrimination within the last two (2) years are debarred from bidding.

A pre-Bid conference will be held at 10:00 AM on April 16, 2024, in Bolton Town Hall, 221 Ninth Street, Bolton, NC 28423.  Prospective BIDDERS are encouraged to attend this pre-bid conference as part of their good faith efforts.

March 28, 2024                                                           
Date
Shawn Maynor
Mayor
Town of Bolton

Print Friendly, PDF & Email